Disclaimer
The guides on this site are general information for people who already work on, or are learning about, building management systems. They are not a substitute for manufacturer documentation, site-specific design, risk assessment or the judgement of a competent person.
- Live plant. Changing BMS settings can start, stop or override plant such as boilers, chillers, AHUs, pumps and fire dampers. Follow your site's permit and isolation procedures, agree changes with the building operator, and take a backup before you edit a station or controller.
- Electrical work. Any work on electrical installations in the UK must comply with BS 7671 and be carried out by someone competent to do it.
- Versions change. Menus, property names and defaults vary between software versions and manufacturers. Check against the documentation for the version on your site.
- Trademarks. Niagara, JACE, BACnet, Modbus, EC-Net and other product names belong to their owners. This site is independent and not endorsed by any manufacturer.
The site is provided as it is, without warranty. To the extent the law allows, no liability is accepted for loss or damage arising from use of the information here.